Presenter: Bracken V. Spencer, PE, PMP

The design of the Stillwater Mine's Blitz Sand Backfill Plant involved optimizing the plant location bewteen available delivery envelope, geologic structures and planned access in addition to the capacity to meet both current and expected backfill demand capacities. Lessons learned from previous sand backfill plants and other construction projects were leveraged to develop a plant that meets the needs of both operators and maintenance personnel. An overview of the completed project along with lessons learned through the design, excavation, construction, and commissioning of the project will be covered.

Weir Minerals Webinar Series Sponsor
Recorded Date: June 22, 2020
Speaker(s): Bracken V. Spencer
Format: MP4
Download Size: 92.94 MB
Length: 53:22
  • List Price: $90.00
  • Member Price: $45.00
 
Want to save more?
Log into see if you qualify for a lower rate.
Members save $45.00 or more Join
Item Details:
Design, Development, Construction and Commissioning of the Stillwater Mine's Blitz Sand Backfill Plant
Back to Design, Development, Construction and Commissionin

Related products that might be of interest…

Back to Product Detail
There are not any reviews for this product.

0